ALARA

Safety engineering where an explosive atmosphere is credible

Explosion Protection

Where a process can release flammable gas, vapour or dust, classification, equipment selection, electrical safety, site inspection and code compliance are critical duties. ALARA provides design, consulting, analysis and site checks to the standards below.

ATEX 100a (Directive 94/9 EC)

EU

Conformity requirements for equipment and protective systems in explosive atmospheres.

ATEX 137 (Directive 99/9, 99/92/EC)

EU

Risk management and worker protection where an explosive atmosphere may occur.

BS EN 60079-10-1:2009

EN

Area classification for flammable gas atmospheres.

BS EN 60079-10-2:2009

EN

Area classification for combustible dust atmospheres.

BS EN 60079-14:2008

EN

Design and installation of electrical systems in hazardous areas.

NFPA 495 Explosive Materials Code (2013)

NFPA

Storage, handling and use of explosive materials.

NFPA 496 Purged & Pressurized Enclosures

NFPA

Pressurisation protection of electrical equipment in a hazardous area.

NFPA 497 (2012)

NFPA

Classification guidance for flammable gas and vapour.

NFPA 499 (2013)

NFPA

Electrical installation guidance for combustible dust.

Call the technical team for hazardous-area classification, equipment selection and the site check.

Let us review the project

From clients

We worked with the ALARA team on modernising the fire-detection systems at our industrial plant. Both project management and commissioning were thoroughly professional. On-time delivery and complete technical documentation made the work much easier.

Ahmet D.
Plant Manager / Energy

They took on fire-safety design and site inspection at our construction site. The team's command of the field and their rigour on the standards were genuinely impressive. ALARA is now a solution partner on our projects.

Zeynep K.
Occupational Health and Safety Coordinator

We asked ALARA to integrate the fire-automation systems into our BMS. The integration was uneventful, the reporting screens are easy to use, and their continued support moved the operation forward.

Murat T.
Building Management Systems Specialist

Questions

Which stages does your fire engineering service cover?

It covers pre-design risk analysis, system design, hydraulic calculations, material selection, installation review and commissioning inspections. The whole process follows international NFPA and EN standards.

Can fire protection systems be integrated with building automation?

Yes. ALARA specialises in this. We integrate fire systems with BMS, SCADA or PLC infrastructure so the whole building can be supervised from one centre.

How often do you provide periodic maintenance?

It depends on the site. We typically recommend a check every six months and a full test once a year, with 24/7 emergency support when required.

Do you work on projects outside Turkey?

Yes. There are 1,134 reference projects in 41 countries. Experience is 37 years in the home country and 33 years abroad, covering design, supervision, testing and commissioning, and consulting.

Who are the training and consulting services for?

We prepare dedicated programmes for our clients' technical teams, maintenance staff and occupational safety specialists. Training is planned project by project, on site or remotely.

From the practice